Citations checked against 42 CFR Part 493 on 11 November 2026Independent publisher. Not affiliated with CMS, CDC or any accreditation organization.
CLIA Templates

Kits / Procedures and Verification

PM-01 to PM-09

CLIA Procedure Manual and Method Verification Kit

Six of the ten standard-level deficiencies CMS cited most often in 2024 fall under four sections of the regulation, 42 CFR 493.1251 to 493.1254: storage and operating conditions, the procedure manual and its content, expired materials, verification of performance, and maintenance.

This kit puts those records in order. The procedure template walks through each of the fourteen items a procedure has to cover and shows which ones the manufacturer's instructions can satisfy. The verification plan and worksheet take a new analyzer from the plan to a signed summary, and the worksheet does the arithmetic.

Written for: Laboratories performing moderate or high complexity testing, especially when adding a test, replacing an analyzer or rebuilding a procedure manual.

First page of PM-04 Method Verification Plan and Summary, showing the document header, control block and the start of the form
PM-04 Method Verification Plan and Summary, first page, before personalization. Bracketed fields fill in from the Personalize tool or by hand.

Look inside

What happens after you buy

  1. 1
    Pay securelyCheckout is run by Lemon Squeezy, which handles payment and any sales tax. Your receipt arrives by email straight away.
  2. 2
    DownloadThe receipt links to a zip file with every document in Word or Excel, plus a fillable PDF of each one. Open the Start Here guide first.
  3. 3
    Make it yoursOptional: drop the zip into the Personalize tool to add your name, CLIA number and logo to every file.
  4. 4
    Review and signYour laboratory director reviews, adapts and approves each document before use.
  5. 5
    Stay currentWhen we revise a file in the next 12 months, the updated version is available from your original order.

What is in the kit

Doc no.DocumentFormat
PM-01Procedure Manual Policy
How procedures are written, approved by the current director, reviewed, changed and retired.
Word + PDF
PM-02Test Procedure Template
Fourteen sections with prompts, and a crosswalk to each item in 493.1251(b) showing what the manufacturer's instructions may cover.
Word + PDF
PM-03Procedure Manual Index and Review Log
Every procedure with its approval date, review due date, discontinuance date and a status flag.
Excel + PDF
PM-04Method Verification Plan and Summary
Plan, results, calibration and control settings, pre-testing checklist and director sign-off for an unmodified FDA-cleared test.
Word + PDF
PM-05Verification Data Worksheet
Four tabs for precision, accuracy, reportable range and reference intervals. Calculates mean, SD, CV, bias, slope, recovery and flags.
Excel + PDF
PM-06Maintenance and Function Check Log
A dated log for each instrument, with a schedule tab that flags tasks due and overdue.
Excel + PDF
PM-07Calibration and Calibration Verification Record
Calibration details, the reason for each verification, three levels across the reportable range and the outcome.
Word + PDF
PM-08Storage and Operating Conditions Policy
Your criteria for each unit and room, what to do when a reading is out, labeling, and expiration and lot rules.
Word + PDF
PM-09Temperature and Humidity Log
Daily readings checked against the ranges you set, with out-of-range entries flagged.
Excel + PDF

Regulation behind each document

The middle column is our plain-language summary. Read the regulation itself before you rely on it.

CitationWhat it asks forAddressed in
42 CFR 493.1251A written procedure for every test, with the listed content, approved, signed and dated by the current laboratory director before use.PM-01, PM-02, PM-03
42 CFR 493.1252(b)-(e)Criteria for storage and operating conditions, monitored and documented. Labeling. No expired or deteriorated materials. No mixing of kit lots unless the manufacturer allows it.PM-08, PM-09
42 CFR 493.1253(b)(1), (b)(3), (c)Before reporting patient results from an unmodified FDA-cleared or approved test: accuracy, precision, reportable range and reference intervals verified and documented.PM-04, PM-05
42 CFR 493.1254Maintenance and function checks as the manufacturer defines them, at least as often as specified, and documented.PM-06
42 CFR 493.1255Calibration, and calibration verification at least every six months and after the listed events.PM-07
42 CFR 493.1105(a)(2), (a)(3)(i)Procedures kept two years after discontinuance. Verification records kept while the test is in use.PM-03, PM-04

What the kit does not do

  • The kit does not write your procedures or supply your data. The template shows what each procedure has to cover. The content comes from your manufacturer's instructions and your own practice.
  • PM-04 and PM-05 cover verification of unmodified FDA-cleared or approved tests. Modified tests and laboratory-developed tests need performance specifications established under 493.1253(b)(2), which asks for more than these forms.
  • The worksheet calculates. It does not decide. The regulation sets no sample numbers or acceptance limits, so your laboratory director does.
  • Requirements specific to a specialty, such as microbiology, hematology or immunohematology, are not covered.

Your director stays in control

These are templates, written so your laboratory director can review, adapt and approve each one quickly. Nothing is used until they sign it.

CLIA is a federal minimum. Your state, and your accreditation organization if you have one, may require more. We do not promise a survey outcome, and we do not give regulatory or legal advice. Read the full terms.