CLIA deficiency D5403: procedure manual content
Short answer
D5403 means a written procedure left out items the regulation requires, such as specimen requirements, calibration, controls or what to do when the test system fails. The fix is to check each procedure against the list in 42 CFR 493.1251(b) and add what's missing.
D5403 is cited when a written procedure leaves out items the regulation lists, such as specimen requirements, calibration, control procedures or what to do when the test system fails. It was number 4 on CMS's 2024 list of standard-level deficiencies, cited in 609 laboratories.
Reviewed 13 Nov 2026 against the sources linked below. General information, not regulatory or legal advice.
What the regulation requires
- Each procedure includes the items listed in 42 CFR 493.1251(b) when they apply to the test. Among them: specimen collection, handling and rejection criteria; step-by-step performance; preparation of reagents and controls; calibration and calibration verification; the reportable range; control procedures; corrective action when calibration or controls fail; limitations and interfering substances; reference intervals; critical values; references; how results are reported; and what to do when the test system is inoperable.
- The manufacturer's instructions or operator's manual may be used to meet the items in paragraphs (b)(1) to (b)(12). The laboratory supplies whatever the manufacturer does not.
What surveyors typically find
A package insert used as the procedure with nothing added for the parts it does not cover.
How to close the gap
- Go through each procedure against the list in the regulation, item by item.
- Where the package insert covers an item, say so and point to it. Where it does not, write the laboratory's own text.
- Pay particular attention to the items inserts rarely cover: critical values and who is called, how results are entered and reported, and what the laboratory does when the instrument is down.
- Have the director sign and date the completed procedure.
If you have already been cited
A plan of correction for D5403 says what was fixed, how you checked whether patient results were affected, what changed so it does not recur, and how you will monitor it. See how to write a plan of correction.
Documents for this requirement:
Which items do package inserts usually miss?
The ones specific to your laboratory: specimen rejection in your setting, critical values and the notification steps, how results reach the record, and the backup plan when the system is down.
Do all the listed items apply to every test?
No. The regulation says each applies when applicable. A procedure for a qualitative test has no reportable range to state, for example. Mark an item not applicable so a reader can see it was considered.
Sources
Summaries on this page are ours and are written for convenience. The regulation and the agency documents control.